
Sprint Oil and Gas Services needed more than a building in Hamriyah Free Zone — it needed a working base. Midas EPC delivered the complete oil and gas facility construction project in the zone’s Phase 2 in 2021: three warehouses, an office building, auxiliary buildings and an operational yard on a 5,000 m² site, planned and built as one coordinated package.
Project facts
An oilfield services base lives on coordination between its parts — equipment moves from yard to warehouse to workshop and out to the field, and the site layout either helps or fights that flow every day. Storage here was deliberately split across three separate 12 m × 12 m warehouses rather than one large shed — keeping materials organised by function, with the bulk of the 5,000 m² site left as open working yard. Midas Building Contracting led the civil construction and overall site delivery, planning the buildings and yard as one operation.
The three warehouses were constructed by Midas Metal Industries, the group’s steel fabrication division, while Midas Electromechanical Contracting installed the electrical and mechanical systems the operation runs on — power, lighting and climate for the office block, and the heavier services the warehouses and yard operations demand.
Multi-building sites are where single-contractor delivery earns its keep: one program, one point of accountability across every structure and the yard between them. That’s the model we set out in the advantages of EPC contracts.
Planning oil and gas facility construction in Sharjah’s free zones? See our industrial civil construction services or talk to us early in your site planning. Related projects: Oil and Gas International warehouse and the OOSC sandblasting and coating centre.