As of 2026, the structural shell of a typical industrial warehouse in Sharjah costs in the range of AED 1,000 to 1,500 per m². This covers the building structure in either PEB or hot rolled steel, excluding fire fighting systems and MEP, which are priced separately based on your facility’s specific requirements. Here is what actually determines where your project lands in that range, and why.

Most contractors in the UAE won’t publish numbers. We will, because after 100+ industrial projects across Hamriyah Free Zone, SAIF Zone, Sajja and mainland Sharjah, we know the ranges hold, and we know the factors that move them. What follows is the same explanation we give clients across the table.

The base range: AED 1,000 to 1,500 per m²

This covers the warehouse structure itself: engineered, fabricated and erected, in either pre-engineered building (PEB) or hot rolled steel construction. It does not include fire fighting systems or MEP, and there is a good reason for that, covered below. Where your project sits within the range depends primarily on the structural decisions: spans, heights, loads, and the structure type you choose.

PEB vs hot rolled steel: which one, and what it does to cost

For most warehouses, and especially for bigger projects, PEB is usually the cheaper and more suitable option. Pre-engineered buildings are optimised at the design stage so every kilogram of steel is doing work. Fabrication is faster, and erection is faster still. The economics improve as the building gets larger, which is why the majority of large industrial sheds in Sharjah’s free zones are PEB.

Hot rolled steel earns its place when the structure has to do more than enclose space. The clearest example is cranes. For heavy structures such as crane-carrying buildings, the cost of a PEB goes up by at least 20%. The frames must be substantially reinforced to take the dynamic loads, and at some point conventional hot rolled sections become the more sensible engineering answer. If your operation needs overhead cranes, say so at the first meeting. It is the single structural decision with the largest cost consequence.

(Our group fabricates and erects both. See our steel fabrication and erection capability, which means the recommendation you get is engineering-led, not limited by what we can build.)

Why fire fighting and MEP are always priced separately

Any contractor who quotes you a single per m² price “including everything” is guessing, and you’ll pay for that guess one way or another.

Fire fighting depends entirely on your area, pump size and activity. A general goods storage shed and a facility storing higher-risk materials are different worlds in Sharjah Civil Defence terms: different system classifications, different pump capacities, different coverage requirements. The system is designed to your activity, then priced, not the other way round. On Midas projects this scope is delivered by Midas Electromechanical Contracting, a Sharjah Civil Defence approved fire fighting contractor, so the system that’s priced is a system that will pass inspection.

Electrical depends completely on your load in kW. A warehouse with lighting and small power is one design. Add process machinery, cold storage or heavy workshop equipment and the distribution, transformer capacity and SEWA connection requirements change entirely. Declare your realistic connected load early, including future expansion, because it drives both the electrical cost and the SEWA application. Underestimating it is one of the most common causes of late-stage cost surprises.

The 2026 factor: prices are rising, fast

Costs in the UAE market are currently rising steeply due to material shortages in the ongoing market scenario, with structural steel and related materials as the main pressure. Practically, this means two things for anyone budgeting a warehouse in 2026. First, a quotation from last year is not a budget for this year. Second, the gap between “planning to build” and “signing to build” now has a real price attached to it. One of the advantages of an EPC contract in this market is locking a fixed price with a contractor who procures early. On our projects, steel is ordered while foundations are still going in, which shortens the window in which the market can move against you.

What this looks like on real projects

Schedule is cost. Every month of program is overhead, financing and delayed operations. The Tamra Alloys facility went from mobilisation to Building Completion Certificate in four months under a single EPC contract. The Al Faris equipment and rental facility was delivered on time and on budget, with civil, steel and MEP works running under one program. That delivery model is where real money is saved, more than in any per m² negotiation.

Frequently asked questions

How much does it cost to build a warehouse in Sharjah in 2026?
Around AED 1,000 to 1,500 per m² for the structure (PEB or hot rolled), with fire fighting and MEP priced separately based on your activity, area and electrical load.

Is PEB cheaper than conventional steel construction?
Usually yes, and increasingly so as the project gets bigger. The exception is heavy-duty structures: crane buildings push PEB costs up by 20% or more, and can shift the answer to hot rolled steel.

Why won’t anyone give me one all-inclusive price per m²?
Because fire systems depend on your activity classification and MEP depends on your kW load. Neither can be honestly priced before those are defined. A serious contractor prices the structure, then engineers and prices the systems to your actual requirements.

How do I get an accurate price for my project?
Share your plot location and size, intended activity, required clear height, any crane requirements, and your estimated electrical load. With those five inputs, a warehouse contractor can give you a real number instead of a range. Contact us and we’ll do exactly that.

Does the price include authority approvals?
On a Midas EPC contract, building permit coordination, SEWA connection and Civil Defence certification are managed within the scope of turnkey delivery: one contract from design to certified handover.